Potential shortages of pet coke during loading at Jose Terminal


We´ve noted an increase of shortages on shipments of Pet coke cargoes loaded at Jose Terminal because of the water content not taken into account during loading and by shore scales.
 
 
In order to maintain the Green delayed Petroleum coke suitable for loading (currently located at the yards of the port of Jose), the piles are sprayed with fresh water (either during storage and during the loading operation) to keep the temperature levels low and to prevent auto ignition.
 
However, you may note that the terminal measures to determine the amount of cargo leaded (shore scales, and Draft survey conducted by Terminal ´s officers) doesn’t take into account the weight of the water sprayed out for which we´ve noted that shortages that could go up to 400 MT are occurring to various shipments with the subsequent claims at disports.
 
You may also note that some water is separated from the petroleum coke filling the bilge tanks but the water quantity could not be determined because overload the mentioned tanks. In addition, the water coming from the coke to the bilge tanks cannot be wasted out to the sea given the contamination that this could cause with the subsequent fines to the vessel/owners.
 
Given the difficult position the above puts the ships on, our first recommendation will be to advice Masters about this situation in order to take any precautionary measure that could be taken on board and to appoint independent surveyors that could conduct draft surveys who could try to separate the water from the coke content and to claim against the terminal for the rest of the cargo in case a shortage is noticed.
 
Should you have any further question, please don’t hesitate on contacting us.

Increasing Ignition during loading of petcoke at the port of Amuay

We´ve recently noticed that the number of cases of ignition of petcoke on board at the port of Amuay has increased with the subsequent risk to the safety on board.

New currency exchange system introduced by the government with the exchange agreement N°35

With the new economic announcements by the government and the exchange agreement N°35 enforced since March 9th, two rate of exchange are now applicable for all transactions involving foreign currency locally. 

General advice regarding Loading of coal at Venezuela

As per recent monitoring, the loading of coal at Maracaibo is presenting issues relative to discrepancy between ship/shore figures but also cargo issues for not complying with the IMSBC code.

General advice for ship´s loading DRI A (HBI) at Orinoco River

Since the reactivation of Palua´s and San felix´s (Orinoco river) HBI plants that has increased significantly the shipments of the mentioned cargo, risks have increased for which we´ve prepared this circular including some precautionary measures and advice for all vessels calling locally to take into consideration.

1 2 3 4 5 6 7